LBFL: International Investment, Global Engineering and Financial Consulting
About Us
  • About Company
  • Investment Project Financing
  • Long-Term Loans
  • Lending up to 90%
  • Refinancing
  • Finance and Technology
  • Latest Projects
  • Questions and Answers
Industries
  • Finance
  • Consulting
  • Real Estate
  • Power
  • Oil and Gas
  • Mining and Handling
  • Industry and Environment
Financing
  • Thermal Power Plants
  • Hydroelectric Power Stations
  • Solar Power Plants
  • Wind Farms
  • Electrical Substations
  • Waste Processing Plants
  • Water Treatment Plants
  • Sea Ports and Terminals
  • Liquefied Natural Gas Plants
  • LNG Regasification Terminals
  • Mining and Processing Plants
  • Chemical Plants
  • Mineral Fertilizer Plants
  • Cement Plants
Publications
Contact Us
    English
    • Русский язык
    English
    • Русский язык
    LBFL: International Investment, Global Engineering and Financial Consulting
    About Us
    • About Company
    • Investment Project Financing
    • Long-Term Loans
    • Lending up to 90%
    • Refinancing
    • Finance and Technology
    • Latest Projects
    • Questions and Answers
    Industries
    • Finance
    • Consulting
    • Real Estate
    • Power
    • Oil and Gas
    • Mining and Handling
    • Industry and Environment
    Financing
    • Thermal Power Plants
    • Hydroelectric Power Stations
    • Solar Power Plants
    • Wind Farms
    • Electrical Substations
    • Waste Processing Plants
    • Water Treatment Plants
    • Sea Ports and Terminals
    • Liquefied Natural Gas Plants
    • LNG Regasification Terminals
    • Mining and Processing Plants
    • Chemical Plants
    • Mineral Fertilizer Plants
    • Cement Plants
    Publications
    Contact Us
      English
      • Русский язык
      English
      • Русский язык
      LBFL: International Investment, Global Engineering and Financial Consulting
      English
      Русский язык
      • About Us
        • Back
        • About Us
        • About Company
        • Investment Project Financing
        • Long-Term Loans
        • Lending up to 90%
        • Refinancing
        • Finance and Technology
        • Latest Projects
        • Questions and Answers
      • Industries
        • Back
        • Industries
        • Finance
        • Consulting
        • Real Estate
        • Power
        • Oil and Gas
        • Mining and Handling
        • Industry and Environment
      • Financing and Engineering
        • Back
        • Financing and Engineering
        • Thermal Power Plants
          • Back
          • Thermal Power Plants
          • Financial model for a thermal power plant
          • Thermal power plant project financing
          • Commercial and industrial loan for thermal power plant
          • Thermal power plant design
          • Thermal power plant construction
          • Thermal power plant modernization
        • Hydroelectric Power Stations
          • Back
          • Hydroelectric Power Stations
          • Financial model for a hydroelectric power plant
          • Hydropower plant project financing
          • Commercial and industrial loans for hydropower plants: bank funding
          • Hydropower plant design
          • Hydropower plant construction
          • Hydropower plant modernization
        • Solar Power Plants
          • Back
          • Solar Power Plants
          • Financial model of the solar energy project
          • Solar power plant project financing
          • Industrial and commercial loans for solar power plants: bank financing
          • Solar power plant design
          • Solar power plant construction
          • Solar thermal power plant construction
          • Solar power plant modernization
        • Wind Farms
          • Back
          • Wind Farms
          • Financial model of the wind farm project
          • Wind farm project financing
          • Commercial and industrial loans for wind farms: bank financing
          • Wind farm engineering services
          • Wind farm construction
          • Wind power plant modernization
        • Electrical Substations
          • Back
          • Electrical Substations
          • Financial model of electrical substation
          • Electric substation financing
          • Substation design
          • Substation construction
          • Substation modernization
        • Waste Processing Plants
          • Back
          • Waste Processing Plants
          • Financial model for waste processing plant
          • Waste processing plant financing
          • Waste recycling plant design
          • Waste processing plant construction
          • Waste processing plant modernization
        • Water Treatment Plants
          • Back
          • Water Treatment Plants
          • Financial model of water treatment plant
          • Wastewater treatment project financing
          • Wastewater treatment plant design
          • Wastewater treatment plant construction
          • Wastewater treatment plant modernization
        • Sea Ports and Terminals
          • Back
          • Sea Ports and Terminals
          • Financial model of the seaport
          • Financing for seaport projects
          • Seaport engineering design
          • Seaport construction
          • Seaport modernization and expansion
        • Liquefied Natural Gas Plants
          • Back
          • Liquefied Natural Gas Plants
          • LNG plant financial model
          • LNG plant project financing
          • LNG plant design
          • Construction of liquefied natural gas plants
        • LNG Regasification Terminals
          • Back
          • LNG Regasification Terminals
          • LNG regasification terminal project financing
          • LNG regasification terminal design
          • LNG regasification terminal construction
        • Mining and Processing Plants
          • Back
          • Mining and Processing Plants
          • Financial model of a mining and processing plant
          • Mining and processing plant financing
          • Mining and processing plant design
          • Mining and processing plant construction
        • Chemical Plants
          • Back
          • Chemical Plants
          • Financial model of a chemical plant
          • Chemical plant project financing
          • Chemical plant design
          • Chemical plant construction
          • Chemical plant modernization
        • Mineral Fertilizer Plants
          • Back
          • Mineral Fertilizer Plants
          • Financial model of a mineral fertilizer plant
          • Mineral fertilizers plant financing
          • Mineral fertilizer plant design
        • Cement Plants
          • Back
          • Cement Plants
          • Financial model for a cement plant
          • Cement plant project financing
          • Cement plant design
          • Cement plant construction
          • Cement plant modernization
      • Publications
      • Contact Us
      Av. Brg. Faria Lima, 1384 - Jardim Paulistano, Sao Paulo - SP, 01452-002, Brazil
      info@linkbridgefinancialltd.com
      • Home
      • Publications
      • Investment in Canadian hydropower sector

      Investment in Canadian hydropower sector

      Investment in Canadian hydropower sector

      Link Bridge Financial LTDA LBFL offers a full range of services for successful investments in Canada's hydropower projects, including long-term loans and refinancing.

      ►  We offer project finance and investments: from $ /€ 5 million or equivalent with a loan duration up to 20 years
      Canada produces a huge amount of relatively cheap electricity due to the high share of hydropower in the country's energy mix.

      Investment in Canadian hydropower sector continues to be an important factor in determining the success of the energy transition.

      Canada is one of the countries that are betting on the development of renewable energy sources.

      In the second half of the 2010s, more than 60% of the country's energy balance came from renewable energy sources, with the share of hydropower in total energy consumption exceeding 25%.

      This result will improve as new projects are planned.

      However, the financing of large investment projects in the hydropower sector faces a number of obstacles, including the search for new sites for the construction of dams, strict government regulation, environmental restrictions, and others.

      The parameters and format of the energy market are determined by the provincial governments, so in this country the activities of energy companies are constantly balancing between the free market and regulation.

      Due to the very low cost of large dams, electricity prices in most Canadian cities are much lower than in the US and most EU countries.

      If you are interested in financing hydropower projects in Canada or other countries, please contact the Link Bridge Financial LTDA LBFL team.

      We are ready to develop customized business solutions for you and help in the implementation of a large project at any stage.

      Role of hydropower in Canada's energy sector

      The history of Canadian energy goes back to the time of Thomas Edison.

      Parliament in Ottawa was lit with electric lamps in 1883, and a year later the first energy company (Pembroke Electric Lighting Company) was established, which has been successfully operating to this day.

      In 1891, the Canadian Electricity Association was founded to represent the interests of the energy industry. Six years later, the first 11 kV transmission line with a total length of 27 km was built in Canada.

      Construction of the first large hydroelectric power plant in Canada began in 1902 on the site of Niagara Falls. However, the boom in hydropower came in the 1960s and 1980s, with the launch of the Manic-Outardes and James Bay projects in Quebec, the Peace River project in British Columbia, the Nelson River project in Manitoba, and other giants.

      At the end of the 2000s, the total installed capacity in the electricity sector was about 125 GW, and the annual generation reached 600 TWh.

      Local companies exported more than 30 TWh of energy to the US (the difference between exports and imports), the rest is consumed by Canadians.

      In those years, about 75,000 people were employed in the country's electric power industry.

      In 2008, electricity generation was 601 TWh, a decrease of 6 TWh from the previous year. This was mainly due to rising commodity prices and the subsequent wave of the economic crisis. Under these conditions, the production of the hydropower sector has grown, to some extent replacing the expensive fossil fuels and helping to mitigate its consequences for business.

      Hydropower in Canada in 2008 was represented by 75 GW of installed capacity, highly unevenly distributed throughout the country. Thermal power plants (coal, natural gas and fuel oil) accounted for 36 GW, nuclear power plants accounted for about 13 GW.

      As of 2014, the hydropower sector was mainly developed in Quebec (38.4 GW of installed capacity) and British Columbia (13.8 GW), as well as in Ontario (8.5 GW), Newfoundland and Labrador (6.8 GW) , Manitoba (5.0 GW) and to a lesser extent in the rest of Canada.

      Much has changed in that time, and Canada's growing investment in hydropower has helped the country minimize the share of fossil fuels in its energy mix in a relatively short time. As of 2020, installed hydropower capacity in Canada exceeded 82 GW, which has been supplemented by new megaprojects over the past year (the Lower Churchill Project with a capacity of 824 MW).

      Canada is the largest producer of hydroelectric power in North America and one of the largest in the world.

      In 2020, the country ranked third in the world in terms of production with 8.8% of total global generation (383 TWh), second only to China and Brazil.

      Financing of large investment projects in the field of hydropower in Canada

      Hydroelectric power generation is a mainstay of the local economy, as a large amount of energy is exported to the US. Economists predict that the sector's growth will create at least one million jobs over the next 20 years.

      Interestingly, Canada's hydropower plants are among the most efficient and technically advanced, converting up to 95% of the mechanical energy of water into electricity.

      Electricity prices in Canada vary widely.

      This is due to the fact that ten provinces form their own electricity markets, and each province traditionally relies on different sources of generation.

      In Quebec, Manitoba, or British Columbia (provinces with a clear dominance of hydropower in the energy mix), electricity prices can be lower than, for example, in Alberta or Ontario, which are dominated by fossil fuel and nuclear power plants. In Nova Scotia and Prince Edward Island, prices have long been even more expensive due to the significant share of natural gas in electricity generation. A major investment in Canadian hydropower could change that.

      Table: Largest hydroelectric power plants in Canada.

      № Name of the power plant Total installed power, GW Years of construction Operator
      1 HPP Robert-Bourassa 5,616 1971-1992 Hydro-Quebec
      2 HPP Churchill Falls 5,428 1971-1974 Churchill Falls Labrador Corporation Limited
      3 La Grande-4 2,779 1978-1984 Hydro-Quebec
      4 GMS Generating Station 2,730 1961-1968 BC Hydro
      5 La Grande-3 2,418 1976-1984 Hydro-Quebec
      6 La Grande-2A 2,106 1973-1992 Hydro-Quebec
      7 Revelstoke 1,980 1977-1984 BC Hydro

      One of the largest investment projects in the Canadian hydropower industry in recent years has been the construction of the Lower Churchill Project in Labrador, consisting of 4 Kaplan turbines with an installed capacity of 206 MW each.

      This project exposed the difficulties of investing in the energy sector and once again demonstrated the importance of deep pre-investment analysis and professional planning.

      The ambitious energy project, with an initial budget of $6.2 billion, started in 2012 by local companies, dragged on for many years and ended up costing $12.7 billion, including due to social and environmental obstacles. In mid-2021, the authorities announced their intention to partially offset the cost overruns of the project initiators in order to maintain low electricity prices.

      Despite the challenges, building new power plants using renewable energy is already cheaper than repairing and maintaining existing power plants running on fossil fuels. It is not surprising that Canadians and foreign investors are still eager to invest in the construction of hydroelectric power plants.

      Further major projects are planned in British Columbia and Labrador, but these will not be easy to implement for a number of reasons.

      Environmental organizations are actively opposed to investment in Canada's hydropower, arguing that large hydropower plants can cause irreversible problems in nature.

      Among the most frequently cited environmental risks, experts cite low oxygen content in reservoirs, disruption of natural fish migration and increased likelihood of sedimentation in rivers.

      Canada retains opportunities for investment and development of the country's hydropower

      Opposition from various social groups, including local Indian tribes, makes it difficult to make large investments.

      However, researchers are confident that to date, Canada retains a huge potential for the development of the hydropower sector.

      Due to the large number of hydroelectric plants already built, it has become more difficult to find suitable sites for HPP construction. However, there are areas where it would be possible to build hydroelectric power plants if a number of economic, social and environmental conditions are met.

      According to the Canadian Hydropower Association, the available natural resources of the country, with the current level of technology, allow increasing the capacity of the hydropower sector to at least 160 GW.

      This opens up impressive investment opportunities for local and foreign companies.

      Investing in Canadian hydropower: our services for businesses

      The largest hydroelectric power plants in Canada are located in the provinces of British Columbia, Quebec, Ontario, Newfoundland and Labrador.

      These provinces remain centers of attraction for major foreign investment in Canadian hydropower sector.

      As we mentioned above, the power generation market in Canada is extremely diverse and the regulatory framework in each province can be very different from its neighbors. The general trend towards a free market has long been observed, however, real freedom of investment in the hydropower sector is not provided everywhere.

      For example, the province of Ontario took the first steps towards liberalizing the sector in the late 1990s by passing the Energy Competition Act and allowing foreign investors to become full market participants.

      Investors in Ontario were among the first to compete for the right to participate in large projects, which significantly accelerated the progress of the industry.

      Similar steps are now being taken by other provinces, but the role of state regulation is still great. Experts predict that the trend towards liberalization, along with the existing need to ramp up renewable energy, should encourage foreign investment in Canadian hydropower sector in the coming decades.

      Our company offers the following services for medium and large businesses:

      • Financing of hydroelectric power plants, including long-term loans with a maturity of up to 20 years, refinancing, bank guarantees and other instruments.

      • Organization of project finance schemes, including the opening of SPV, development of the contractual structure of the project, preparatory work, negotiations, consultations.

      • Additional investment services such as financial modeling, pre-investment studies, feasibility studies, obtaining permits, etc.

      Link Bridge Financial LTDA LBFL has brought together a team of experienced professionals in corporate finance, investment, financial engineering and other fields. We have already helped large companies finance and manage investment projects in various countries, including Spain, France, Germany, Saudi Arabia, Brazil, and others.

      If you are looking for long-term financing for the construction or modernization of hydroelectric power plants in Canada, please contact our representatives and learn more about our services.

      We are ready to join your project at any phase, from pre-investment studies to the operational phase.
      To consider an application for financing, fill out the form and send it to us by e-mail along with the project brief, or contact our experts
      Order service

      Tags
      investment canada hydropower plant hpp

      Industries and Services
      Project finance
      Project finance
      Investment consulting
      Investment consulting
      Bank guarantee (BG)
      Bank guarantee (BG)
      Refineries: lending and financing
      Refineries: lending and financing
      Stand-by Letter of Credit (SBLC)
      Stand-by Letter of Credit (SBLC)
      Debt funding
      Debt funding
      Investment and construction engineering
      Investment and construction engineering
      Mezzanine financing
      Mezzanine financing
      Documentary credit (L / C, DLC)
      Documentary credit (L / C, DLC)

      Financing and Engineering
      Financial model of electrical substation
      Financial model of electrical substation
      Link Bridge Financial LTDA LBFL offers comprehensive financial services for energy projects, including the development of a financial model for electrical substations.
      Financial model for a hydroelectric power plant
      Financial model for a hydroelectric power plant
      The development of a financial model for a hydroelectric power plant (HPP) plays an important role in obtaining financing for large projects and contributes to the growth of the renewable energy sector.
      Financial model of the wind farm project
      Financial model of the wind farm project
      New financial models for the construction of wind farms are promoting the development of renewable energy through the implementation of large projects.
      Cement plant project financing
      Cement plant project financing
      The concept of long-term project finance (PF) for the construction of cement plants plays an important role in the global economy.
      Solar power plant project financing
      Solar power plant project financing
      LBFL offers financial models with a minimum contribution (10%) and long-term investments for the construction of large solar power plants around the world.
      LNG regasification terminal construction
      LNG regasification terminal construction
      Link Bridge Financial LTDA LBFL offers financing for large gas projects and construction of LNG regasification terminals under an EPC contract.
      Back to list Next article
      Categories
      • News22
      • Technology4
      • Investments and Loans46
      • Project Finance23
      • Finance and Construction10
      • Consulting and Engineering12
      • Infrastructure5
      • Agriculture2
      • Thermal Energy5
      • Solar Energy19
      • Wind Energy12
      • Mining and Processing2
      • Chemical Industry2
      • Oil and Gas2
      • Water Treatment1
      • Waste Recycling3
      • Cement and Concrete2
      Related Articles
      • Investments in the European automotive industry: a steep road to success
        Investments in the European automotive industry: a steep road to success
      • Financing the renewable energy sector in Mexico
        Financing the renewable energy sector in Mexico
      • Financing of the chemical industry in Poland: investments and development
        Financing of the chemical industry in Poland: investments and development
      • Financing wind farms in Austria
        Financing wind farms in Austria
      • Investments in solar power plants in Germany: photovoltaics on the rise
        Investments in solar power plants in Germany: photovoltaics on the rise
      • The largest solar power plant is to be built in the Philippines
        The largest solar power plant is to be built in the Philippines
      • Germany is buying coal to survive the winter, but Brussels is pushing for RES
        Germany is buying coal to survive the winter, but Brussels is pushing for RES
      • Loans for fossil fuel projects: leading banks are slow to support a carbon-free economy
        Loans for fossil fuel projects: leading banks are slow to support a carbon-free economy
      • Poland invests in extending the life of thermal power plants
        Poland invests in extending the life of thermal power plants
      • Poland refuses Russian oil thanks to investments in oil terminals
        Poland refuses Russian oil thanks to investments in oil terminals
      Tag Cloud
      agriculture audit australia austria automotive plant bank biogas bonds brazil bulgaria business canada cement chemical industry china coal compound feed plant construction consulting contractor cost credit crisis csp design development egypt energy engineering epc equipment esfc eu europe finance financial consulting financial modeling france gas geothermal energy germany green economy holding hotel hpp hydrogen hydropower plant incineration plant india industry infrastructure innovation investment investment fund latin america leasing liquefied natural gas lng loan maintenance malaysia management mexico mining modernization morocco north sea npp nuclear energy offshore wind farm oil oman philippines poland ppp project finance pv real estate recycling refinery res saudi arabia singapore solar photovoltaic power plant solar power plant spain special purpose vehicle spv structured finance technology terminal thermal power plant tpp uae uk usa waste processing plant wastewater treatment plant water treatment wind energy wind farm wind power plant wpp wwtp
      © 2022 Link Bridge Financial LTDA LBFL . All Rights Reserved
      Address
      Av. Brg. Faria Lima, 1384 - Jardim Paulistano, Sao Paulo - SP, 01452-002, Brazil
      Cookies | Notice | Privacy Notice | Disclaimer | Sitemap